Help · Bench
Building at the bench
What to cut next by saw setting, bench mode, measure and fit, glue-up and finish timers.
The Bench opens a project the same way Yard does: tap ☰ and open the file, or turn on sync. It has two tabs at the bottom: The Build for this project, and The Shop for your tools and stock.
Today
The top card, Up next, is the next thing to do, with one button to say it’s done. The cards under it, marked Then, follow in order. Anything waiting shows when it’s free, like clamps coming off at 3:40 PM, and what you can do meanwhile.
Steps wait for what they need:
- Rough-milled stock rests stickered overnight before final milling.
- Parts cut from a glued-up panel wait for the glue-up.
- A part sized by measuring waits until you’ve measured.
- Hardware goes in after the glue-ups it depends on.
- A finish coat waits for the one before it to dry.
Setups
Cuts are grouped by machine setting, in the order a shop day runs: plane to thickness, rip at each fence setting widest first, crosscut at each stop longest first, then dados, grooves and rabbets, mortises and tenons, dovetails and laps, then holes. Set the fence once and cut every part that needs it.
Tick parts as you cut them. Undo sits in the message for a few seconds. A setup your shop can’t do, like a dado width your stack doesn’t make, says so on the card.


Bench mode
One card, one big button, for when your hands are full. It shows the next ready step with its setting in large type; tap the button when it’s done, or Another to take a different one. The screen stays on while it’s open.
Measure and fit
Some sizes are only known once the carcass is built, like a drawer that fits its opening. The design marks them, and Measure & fit lists each one with its planned size. Type what you measured: the saw settings and cut sizes change to match, and the parts waiting on it move up to Today.
Glue-ups
Each glue-up lists its parts and about how many clamps it takes.
- Tick Glue applied, clamps on when the glue is spread. The open time counts down, then the clamp time: 10 and 60 minutes for PVA unless the glue plan says otherwise.
- Tick Out of the clamps when they come off.
If the glue-up needs more clamps than you’ve recorded in The Shop, it says so.
Finishing
Each finishing step lists its product and coats, with how long before a recoat and how long to cure. Tick each coat; the next shows the earliest time it can go on.


Alarms
Turn on Alarm when a wait ends under Today to hear when the clamps can come off, stickered stock is ready, or the next coat can go on. On Android the alarm rings even with the app closed.
Assembly order
Assembly order lists the steps from the Designer’s plan. Tap a step to see its drawing.
Journal
Note what happened as you go, with a photo if you like. Photos stay on the phone that took them. The journal prints with the plan set as the as-built record.
Scan a label
Printed part labels carry a code. Scan a label points the camera at one and opens that part’s steps.
The Shop
The Shop tab keeps what’s true across projects: your Tools & machines with their capacities and blade kerf, Clamps, Maintenance, the Shelf of glue, finish and abrasives, Cutters, Jigs, and Stock, the boards, sheets and offcuts on your rack. Today, across projects shows what every project needs next, and how many clamps are in use.